The material is low carbon or alloy steel,such as ZG270-500,ZG42CrMo,ZG35Mn and so on.
The kiln tyre is for 10000 TPD cement production line,
the weight is around 140 tons with 7800mm diameter.
We make the kiln tyre every day,it is one of our fist product.
Material | C | Si | Mn | P | S |
ZG270-500 | 0.32-0.40 | 0.20-0.52 | 0.45-0.90 | ≤0.035 | ≤0.035 |
Material | C | Si | Mn | P | S | Cr | Mo |
ZG42CrMo | 0.38-0.43 | 0.15-0.35 | 0.75-1.00 | ≤0.035 | ≤0.035 | 0.80-1.10 | 0.15-0.25 |
Material | C | Si | Mn | P | S |
ZG35Mn | 0.30-0.40 | 0.60-0.80 | 1.10-1.40 | ≤0.035 | ≤0.035 |
Item | Standard |
Casting Material | EN 10293/EN 10025/BS 3100/DIN 1681/DIN17205 |
Casting Tolerance in Blank | ISO 8062 CT 13 |
Size Tolerance | DIN ISO 2768m |
NDT | ASTM A609 Level 2 or 3 /EN 12680/ASTM E94 Level 2 or 3 |
Heat Treatment | Normalizing+Tempering+Quenching |
Hardness | As Required |
1)Pattern making
2)Sand core making
We have around 80 technicans for sand core making which is divided into around 10 teams.
Most of the technicans has more than 10 years' experience.
Most of the sand core is made by silica sand with common sand inside of it.
The common sand will be used repeatly.
For some important position,such as R corner,we will use chorme ore sand.
The outside of the sand core,we will do the painting,burn and clean it.
We will assemble diffrent sand cores together and wait for pouring.
3)Melting and pouring
We always do the melting after mid-night for cheaper electric charge.
And we normally do pouring in the early morning.
No. | Equipment Name | Quantity(Set) |
1 | 25 tons Electrical Arc Furnace | 1 |
2 | 50 tons Intermediate Frequency Furnace | 2 |
3 | 120 tons Refining Furnace | 1 |
4 | 120 tons VD Furnace | 2 |
4)Cooling
Chemical composition
After pouring,we will wait for different time for cooling according to casting's weight.
Item | Weight in blank(Metric Tons) | Cooling Time(Hour) |
1 | <25 | 48 |
2 | >25-40 | 72 |
3 | >40-55 | 96 |
4 | >55-72 | 120 |
5 | >72-96 | 144 |
6 | >96-115 | 168 |
7 | >115 | 192 |
5)Heat treatment
6)Draw the line and do the first rough machining
We can do the machining from rough to finished machining.
7)NDT after rough machining
8)Welding repair
We have rich experience for making support rollers and kiln tyres,
then there is no welding for the outside working position.
This is our special technology.
Every year we supply around 400pcs kiln tyres,930pcs support roller,170 sets gear( in two halves).
But for some other castings,if we do the welding repair,
we will do the tempering for stress relief later.
All of our welders have the SGS certficate.
9)Final machining
We have a lot of vertical lathes from 2.5m to 10m.
We get approval from CNAS for our laboratory.
We also have 9 class certificate,such as ABS,DNV,NK,RINA,KR,CCS,BV and so on.
We supply a lot of castings for cement mill,rolling mill,shipbuilding and so on.
We can do the packing according to our rules or according to customers' requirement.
Normally there is a 12 months quality warantty.
We do at least three times NDT:after rough,semi-finished and finished machining.
And also the customer will do the witness during or after finished machining.
If there is also any problem when you receive the castings,
please send us photos and detailed defects,
we will negotiate with you and make a compensation.
A third party inspection before shipment is welcomed.