Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore /After Stern Boss Casting for Shipbuilding

Model NO.
02
Application
Machinery Parts
Machining
Machining Center
Material
Steel
Surface Treatment
Sand Blast
Surface Roughness
Ra6.3
Standard
ASTM
Certification
ISO 9001:2008
Wall Thickness
Min. 50mm
Certificate
ABS,CCS,BV,Lr,Dnv,Rina,Kr,Nk
Packing
Wooden Case
Test Block
230*70*50mm
Surface Hardening
400-450hb
Weight
3 to 190 Tons
Delivery Status
Pre-Machined or Finished Machining
Heat Treatment
Normalizing+Tempering+Quenching
Transport Package
Wooden Case
Specification
12m*9m*6m
Trademark
OEM
Origin
China
HS Code
8414909090
Production Capacity
6, 000 Metric Tons/Month
Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
5000.000kg
Reference Price
$ 2,592.00 - 2,700.00

Product Description

Product Parameters

The material is low carbon or alloy steel,such as ZG270-500,SCW420,SCW450,GS52

Material C Si Mn P S
ZG270-500 0.32-0.40 0.20-0.52 0.45-0.90 ≤0.035 ≤0.035
 
Performance list for stern tube:
Shipyard Name Project Item Unit Weight Flag/Class Quantity Year
Jiangsu New Yangzi Shipbuilding Co.,Ltd. 2400TEU container vessel FWD boss 1.5 tons DNV/NK 5 2023
AFT boss 31.5 tons 5
1800TEU container vessel FWD boss 1.5ton ABS/CCS/NK 20
AFT boss 30 tons 20
59000DWT bulk carrier fore stern casting 2 tons CCS 2
after stern casting 14 tons 2
Samsung Heavy Industries 156800DWT Crude Oil Tanker fore stern boss casting 2.6 tons ABS 4
after stern boss casting 24.7 tons 4
Jiangsu Yangzi Xinfu Shipbuilding Co.,Ltd. 11800TEU container vessel fore stern boss casting 8.2 tons LR 6
AFT stern boss casting 66.8 tons 6
Hudong Shipyard Group Co.,Ltd. 24100TEU container vessel fore stern boss casting 11.8 tons DNV 4
AFT stern boss casting 59.5 tons 4
 
Company Profile



What we can supply?
We are located in Sunzhuang Town,Haian county,Nantong City,Jiangsu,China
When you visit us,we can pick up you from Shanghai Pudong airport.
It will be 2.5 hours from airport to our factory.

Weight 3-190 tons per piece
Machining rough or finished machining(max.13m vertical lathe,12 sets milling and boring machine and so on)
Casting Tolerance CT13
Min. wall thickness 50mm
Material low carbon or alloy steel,OEM fabrication
UT and MT Level 2
Application Cement mill,vertical mill,ball mill,dryer,shipbuilding,forging press,rolling mill,crusher,mining,gearbox
Class certificate DNV,LR,ABS,CCS,BV,NK,RINA,KR
Prodcution Process

1)Pattern making

Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding

We have our own wooden pattern making workshop.
But our company is always busy,

we also have around 10 sub-contractors for pattern making.
They help us for the pattern but will be inspected according to our rules.
We will record for every pattern inspection.

2)Silica or chorme sand cores
We have around 80 technicans for sand core making which is divided into around 10 teams.
Most of the technicans has more than 10 years' experience.
Most of the sand core is made by silica sand with common sand inside of it.
The common sand will be used repeatly.
For some important position,such as R corner,we will use chorme ore sand.
The outside of the sand core,we will do the painting,burn and clean it.
We will assemble diffrent sand cores together and wait for pouring.

3)Melting and Pouring

We always do the melting after mid-night for cheaper electric charge.
And we normally do pouring in the early morning.

No. Equipment Name Quantity(Set)
1 25 tons Electrical Arc Furnace 1
2 50 tons Intermediate Frequency Furnace 2
3 120 tons Refining Furnace 1
4 120 tons VD Furnace 2
Before and after pouring,we will do the chemical compostion test.
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding


4)Cooling

After pouring,we will wait for different time for cooling according to casting's weight.

Item Weight in blank(Metric Tons) Cooling Time(Hour)
1 <25 48
2 >25-40 72
3 >40-55 96
4 >55-72 120
5 >72-96 144
6 >96-115 168
7 >115 192

We have our experience and rules for cooling time.
After cooling,we will shake the casting out of the steel boxes and clean them.
5)Heat Treatment
Normalizing will be 3 days while tempering is 4 days.
We have around 10 sets of heat treatment furnaces.
The biggest one is 12m*9m*6m.
It is also the biggest size of castings we can make.
After heat treatment,we will do the mechanical property test.
Our ordinary test block's size is 230mm*70mm*50mm.
One casting part will min. have 3 pcs test blocks.
We have our testing center and it is approved by CNAS. 
6)Draw the line and do the first rough machining
We can do the machining from rough to finished machining.
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
 
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding




7)NDT after rough machining
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
 
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
 

8)Welding repair
We have rich experience for making support rollers and kiln tyres,
then there is no welding for the outside working position.
This is our special technology.
Every year we supply around 400pcs kiln tyres,930pcs support roller,170 sets gear( in two halves).
But for some other castings,if we do the welding repair,
we will do the tempering for stress relief later.
All of our welders have the SGS certficate.
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding

9)Shot blasting and grinding
We have a robert grinder.
We have a 120 tons rotary shot blasting table.
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
 
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding


10)Final machining
We have a lot of vertical lathes from 2.5m to 10m.
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding
 
Certifications

We get approval from CNAS for our laboratory.
We also have 9 class certificate,such as ABS,DNV,NK,RINA,KR,CCS,BV and so on.

 

Packaging & Shipping

We supply a lot of castings for cement mill,rolling mill,shipbuilding and so on.

We can do the packing according to our rules or according to customers' requirement.

Pre-Machined Large OEM Fabrication Customized Alloy/Carbon Steel Marine Casting Upper/Lower Rudder Carrier Fore/After Stern Boss Casting for Shipbuilding

 

After Sales Service

Normally there is a 12 months quality warantty.

We do at least three times NDT:after rough,semi-finished and finished machining.

And also the customer will do the witness during or after finished machining.

If there is also any problem when you receive the castings,
please send us photos and detailed defects,
we will negotiate with you and make a compensation.

A third party inspection before shipment is welcomed.





 

 

FORTFACAS.COM.BR, 2023