The material is low carbon or alloy steel,such as ZG270-500,SCW420,SCW450,GS52
Material | C | Si | Mn | P | S |
ZG270-500 | 0.32-0.40 | 0.20-0.52 | 0.45-0.90 | ≤0.035 | ≤0.035 |
Shipyard Name | Project | Item | Unit Weight | Flag/Class | Quantity | Year |
Jiangsu New Yangzi Shipbuilding Co.,Ltd. | 2400TEU container vessel | FWD boss | 1.5 tons | DNV/NK | 5 | 2023 |
AFT boss | 31.5 tons | 5 | ||||
1800TEU container vessel | FWD boss | 1.5ton | ABS/CCS/NK | 20 | ||
AFT boss | 30 tons | 20 | ||||
59000DWT bulk carrier | fore stern casting | 2 tons | CCS | 2 | ||
after stern casting | 14 tons | 2 | ||||
Samsung Heavy Industries | 156800DWT Crude Oil Tanker | fore stern boss casting | 2.6 tons | ABS | 4 | |
after stern boss casting | 24.7 tons | 4 | ||||
Jiangsu Yangzi Xinfu Shipbuilding Co.,Ltd. | 11800TEU container vessel | fore stern boss casting | 8.2 tons | LR | 6 | |
AFT stern boss casting | 66.8 tons | 6 | ||||
Hudong Shipyard Group Co.,Ltd. | 24100TEU container vessel | fore stern boss casting | 11.8 tons | DNV | 4 | |
AFT stern boss casting | 59.5 tons | 4 |
What we can supply?
We are located in Sunzhuang Town,Haian county,Nantong City,Jiangsu,China
When you visit us,we can pick up you from Shanghai Pudong airport.
It will be 2.5 hours from airport to our factory.
Weight | 3-190 tons per piece |
Machining | rough or finished machining(max.13m vertical lathe,12 sets milling and boring machine and so on) |
Casting Tolerance | CT13 |
Min. wall thickness | 50mm |
Material | low carbon or alloy steel,OEM fabrication |
UT and MT | Level 2 |
Application | Cement mill,vertical mill,ball mill,dryer,shipbuilding,forging press,rolling mill,crusher,mining,gearbox |
Class certificate | DNV,LR,ABS,CCS,BV,NK,RINA,KR |
1)Pattern making
We have our own wooden pattern making workshop.
But our company is always busy,
we also have around 10 sub-contractors for pattern making.
They help us for the pattern but will be inspected according to our rules.
We will record for every pattern inspection.
We always do the melting after mid-night for cheaper electric charge.
And we normally do pouring in the early morning.
No. | Equipment Name | Quantity(Set) |
1 | 25 tons Electrical Arc Furnace | 1 |
2 | 50 tons Intermediate Frequency Furnace | 2 |
3 | 120 tons Refining Furnace | 1 |
4 | 120 tons VD Furnace | 2 |
After pouring,we will wait for different time for cooling according to casting's weight.
Item | Weight in blank(Metric Tons) | Cooling Time(Hour) |
1 | <25 | 48 |
2 | >25-40 | 72 |
3 | >40-55 | 96 |
4 | >55-72 | 120 |
5 | >72-96 | 144 |
6 | >96-115 | 168 |
7 | >115 | 192 |
We get approval from CNAS for our laboratory.
We also have 9 class certificate,such as ABS,DNV,NK,RINA,KR,CCS,BV and so on.
We supply a lot of castings for cement mill,rolling mill,shipbuilding and so on.
We can do the packing according to our rules or according to customers' requirement.
Normally there is a 12 months quality warantty.
We do at least three times NDT:after rough,semi-finished and finished machining.
And also the customer will do the witness during or after finished machining.
If there is also any problem when you receive the castings,
please send us photos and detailed defects,
we will negotiate with you and make a compensation.
A third party inspection before shipment is welcomed.